Case study · Manufacturing / facility
Alarm response time cut 64% at a Çerkezköy plant
Çerkezköy OSB — mid-size manufacturing site (name withheld)
NetRelay at a Çerkezköy OSB plant for cabinet alarms, lighting and irrigation. Alarm response −64%, night energy −18%.
Alarm notice → response
−64%
Avg 22 min → 8 min
Night lighting energy
−18%
After astronomical schedule
Accidental ‘left on’ events
−95%
8-week window
Remote relay points
14 nodes
One local network
Challenge
Server cabinets, site lighting and irrigation valves ran on separate relays/panels. Alarms were noticed late; night lighting was switched off manually.
Solution
NetRelay IoT boards joined over Ethernet. Cabinet door/temp alarms, astronomical lighting and irrigation scenarios were managed from one panel; events logged via MQTT.
Results
Night consumption and alarm response were compared to baseline over 8 weeks. Accidental ‘left on’ lighting events nearly disappeared.
Timeline · Pilot 2 cabinets + 4 lights → site-wide in 6 weeks