M&L TechnologyIntelligence in motion

Case study · Hotel / hospitality

5651 audit prep time cut 70% at a Çorlu hotel

Çorlu / Tekirdağ — 180-room city hotel (name withheld)

IDNET at a 180-room Çorlu hotel: 5651 logging, guest Wi‑Fi and PMS integration. Audit prep time down 70%.

Audit log prep time

−70%

1–2 days → < 4 hours

Manual Wi‑Fi account creation

−92%

After PMS integration

Log archive continuity

100%

90 days uninterrupted post-pilot

Concurrent guest sessions

450+

Peak-season measurement

Challenge

Guest Wi‑Fi ran on separate gear; 5651 logs were scattered and PMS room–guest mapping was manual. Pre-audit log gathering took 1–2 days with gap risk.

Solution

IDNET Radius Manager centralized hotspot, 5651-compliant logging and hotel PMS integration. Check-in auto-provisioned Wi‑Fi; signed logs lived in one archive.

Results

First audit export for the requested period took minutes. Front-desk Wi‑Fi tickets and manual account creation dropped sharply.

Timeline · Discovery 1 week · install 10 days · PMS mapping 1 week

More case studies

Let’s build together

Have a similar challenge?

Ask a short question and our team will follow up. Filling out the project request form speeds things up if you need a similar solution.

Fill out the project request

Use the project request form for a detailed proposal.